03-04-2009, 12:34 AM
Steve WICoach Lodge for the Barth
I don't have a figure right now. I used materials and services from so many different vendors and it's all filed in the "shoe box" format for the time being (scary isn't it). I am going to figure everything out after it's more complete than it is now.
For instance, I want to put a second floor/deck in the quonset portion.
I've got 100 amp service to the building and haven't done any wiring. I want to run a water line from the well (250') to it.
I picked up a wood furnace and need to get that in place and operational (the sooner, the better).
And I know this will sound strange but we purposely didn't keep track of it. We had a ball park idea on all separate phases of it and if the cost for something was as reasonable as we could find then we went ahead with it.
I guess you could say that whatever was done at this point had to be done regardless of cost, otherwise it just wouldn't have gotten done.
Sorry to babble on, this whole thing is probably boring the masses; when I get a an idea of the total cost I'll be happy to let ya know.
Thank you for the compliments.